Turbo 150 wall conduct incl. THERMOBOX



//cdn.highspeed-network.com/1001/184/themes/3/assets/img/spacer.gif
Turbo 150 wall conduct incl. THERMOBOX
Turbo 150 wall conduct incl. THERMOBOX
Turbo 150 wall conduct incl. THERMOBOX
Wall conduct with telescopic pipe, incl. built-in heat retention system THERMOBOX and stainless steel external blind Turbo for ground-level and conventional installation at ceiling height.
— hose/pipe connection Ø: 150 o. mm
— nozzle depth: 24 mm
— external blind Ø: 180 mm
— installation depth: 350 – 500 mm
— wall penetration Ø: ca. 155 mm
— Blower-Door certified (required opening pressure >65 Pa)
— hose/pipe connection Ø: 150 o. mm
— nozzle depth: 24 mm
— external blind Ø: 180 mm
— installation depth: 350 – 500 mm
— wall penetration Ø: ca. 155 mm
— Blower-Door certified (required opening pressure >65 Pa)
Additional illustrations:
Download:
AssemblyInstructions
S13703_S13703_301.pdf
S13703_S13703_302.pdf
Article description | Order number | EA | Catalogue price without VAT | Availability | |
---|---|---|---|---|---|
white, stainless steel | 4043071 | 1 |
Legend availability
-
Article availability
-
Delivery time 1 to 3 weeks
-
Delivery time more than 3 weeks
-
On request